Selection criteria: required flow rate and pressure head, building height and number of floors, suction submergence depth, water quality (solids content), duty cycle (continuous or intermittent), and space constraints of the mechanical room.
Selection criteria: required flow rate and pressure head, building height and number of floors, suction submergence depth, water quality (solids content), duty cycle (continuous or intermittent), and space constraints of the mechanical room.