High-Precision Nickel Plating Filtration: 200 L/min, 9+ Months Leak-Free, Annual Savings
The customer's main problem appeared to be "filter leakage," but a deeper analysis showed that leakage was only the visible symptom. The real causes were poor corrosion resistance of the filter housing, unreliable sealing, and insufficient filter element performance and service life.
High-Capacity FRPP Vertical Pump Solution: 12,000 L/H Filtration, 0 Leakage, Annual Savings
After studying the customer's actual operating conditions, we found that this was a large-scale, high-requirement replacement project
Complete Pre-Treatment Solution: MIT Vertical Pumps + TF FRP Fans Deliver 16+ Months of Zero-Leakage, Zero-Downtime Operation
After studying TESB's actual operating conditions, we found that the customer was facing more than a simple pump replacement problem. The reliability of the pre-treatment line depends on both tank liquid circulation and fume exhaust. If either system fails, the production line may have to stop. More importantly, the workshop contains both alkaline vapor and acid mist at different stages, so all equipment in contact with the process environment needs strong corrosion resistance.
Vertical Pumps for Electroplating Pickling & Surface Finishing
After reviewing the customer's operating conditions, Meibao found that the problem was not simply about replacing one pump with another.
AAL Electroplating Pickling Case Study
After reviewing AAL's actual operating conditions, Meibao identified three key requirements:Keep the motor away from acid fumes. Prevent shaft-seal leakage. Maintain stable operation when the tank level changes.
Have a Fluid Handling Challenge?
Tell us about your application. Our engineers have solved thousands of fluid handling problems | and yours could be next.